Case Study: Castle Group – Level 1 Office Upgrade
Client: Castle Group | Location: Brookhollow Avenue, Norwest
Project Overview
Castle Group required a full upgrade of their 650sqm “Stage 1” office floor on Level 1 to accommodate their 80 staff members. DNP Projects delivered a construction-only fitout that transformed the existing space into a modern, functional, and collaborative workplace.
Brief & Objectives
The goal was to create a fully refreshed office environment while retaining only five existing offices, repurposed into new meeting rooms. Key objectives included:
Optimising space for 80 staff members
Enhancing collaboration and circulation with curved half-height walls
Integrating modern technology and security
Delivering a functional, aesthetically appealing environment on a tight timeline
Scope of Works
Full demolition of the 650sqm floor (10 truck trips)
Conversion of existing offices into new meeting rooms
Curved half-height walls to improve entry flow
Fully integrated security systems
Collaboration with in-house Design Manager Ric Ranieri
New 3-piece kitchen joinery with stone benchtops
Flooring throughout: acoustic carpet tiles and vinyl in wet areas
Painting throughout the suite
Upgraded blinds and installation of TVs in meeting rooms
Additional electrical works including data and power for 60+ workstations
Delivery & Outcome
The project commenced in early December and was completed by 7th January, meeting Castle Group’s requested timeline. The upgraded office now supports staff productivity and collaboration while offering a modern, comfortable workplace. The seamless transition into the new space demonstrates careful planning, efficient construction, and collaborative design execution.